Commissioning reports
Record the readings you actually took.
Pressure testing, evacuation, operating measurements and electrical readings captured in structured fields, with units attached to every value.
Installations
18 packs of 25 used this month
Ashford Retail Park
ACD-2418 · Commercial
14 Elm Grove
ACD-2417 · Domestic
Kingsway Dental
ACD-2416 · Commercial
ACD-2418 · Installation pack
7 documents · rev 1 · generated 11:42
The problem
Commissioning data is often written on a pad and typed up later, or copied from a previous job because the form asks for numbers the engineer does not have.
How Airforma handles it
Each measurement is recorded against its own field with its own unit. Anything not taken is marked as not recorded, so a report never claims a test was completed when it was not.
The workflow
- 1
Record pressure test values and duration.
- 2
Log the vacuum reading achieved.
- 3
Enter operating pressures, temperatures, superheat and subcooling.
- 4
Record supply voltage and running current.
What you get
- Units recorded alongside every measurement
- Vacuum, pressure, temperature, superheat and subcooling fields
- Electrical values kept separate from refrigerant values
- Not applicable and not recorded options
- Values never defaulted or assumed
Questions
Included in every standard plan.
Domestic and commercial documentation, company branding and unlimited re-downloads from £25 a month.